Objective

A junior oil and gas producer – with limited staff - engaged Vertex to execute their Drilling Program in 2021. Their productive area was very remote and challenging from an execution perspective due to limited local resources. The client was required to complete their drilling, completion, and tie-in activities on an extremely tight schedule, including all sourcing of equipment, services and obtaining regulatory approvals.

Approach

Utilizing Vertex's specialized “Well360” approach, Vertex supported the client’s 2021 Development Program in a timely and cost-effective manner. Using a highly integrated approach to planning and execution, Vertex’s Well 360 team designed, planned, developed AFE estimates, obtained regulatory approvals, and executed all aspects of drilling, completions, and tie-ins (facility and pipelines).

Results

In the space of only 2 short months, Vertex's Well 360 team designed, planned, licensed, and executed the client’s 2021 program in a highly challenging and remote area. The final tie-ins and facility work were performed as the ice-packed lease melted around them and the entire program was delivered from the 2nd week of January 2021 to the first week of April 2021 demonstrating Vertex's ability to deliver expert results in a cost-effective and timely manner.


Put us to
work for you.

Tell us about your project

Whether you're seeking equipment rentals, specialized services, or end-to-end project management, Vertex can help you find a solution. Contact us today.